AS9102 first article inspection (FAI) on a PCBA is the documented proof that a production-representative board meets every requirement in its design package: each BOM part, drawing note, material, special process, and test. The current revision, AS9102C, published by SAE in June 2023, records that proof on three forms: Form 1 for part number accountability, Form 2 for materials, special processes, and functional testing, and Form 3 for every design characteristic. A full FAI is due on a new part. A full or partial FAI is due after a change in design, process, source, location, tooling, or materials, and after a two-year production lapse. Done right, the report is accepted the first time and production releases on schedule.

This walkthrough is for quality engineers and buyers at aerospace and defense OEMs who flow AS9102 down to a contract manufacturer, and for anyone who has had a first article report (FAIR) bounced back. It covers what the standard requires, when it applies to a circuit card assembly, how to build the report step by step, and the mistakes that most often delay approval.

What AS9102 first article inspection covers on a PCBA

AS9100D, clause 8.5.1.3 (production process verification), requires an organization to take a representative item from the first production run of a new part or assembly and verify that the production processes, documentation, and tooling can produce conforming product. The check is repeated when a change invalidates the original result. AS9100D does not name AS9102, but most aerospace primes flow it down on the purchase order as the format for that evidence. Boeing, for example, applies AS9102 to hardware FAI as flowed by the purchase document.

SAE AS9102C states that its requirements are complementary to, not a replacement for, customer and regulatory requirements. In practice, the standard sets the minimum and your customer's quality clauses add to it, so read both before planning the first article.

For a PCBA, the design package usually means the assembly drawing and its notes, the parts list or BOM, the bare-board fabrication drawing, any specification the drawing calls out (most often IPC-A-610 at a stated class and J-STD-001 for soldering), and the test procedure. The three forms account for all of it:

  • Form 1, Part Number Accountability. Identifies the assembly, its drawing and revision, whether this is a full or partial FAI and why, and every part on the BOM.
  • Form 2, Product Accountability: Materials, Special Processes, and Functional Testing. Lists each material and special process with its specification, source, and certificate number, plus the functional test procedure and its result.
  • Form 3, Characteristic Accountability, Verification and Compatibility Evaluation. Lists every design characteristic, including drawing notes, with its requirement, the result, and how it was verified.

When a PCBA needs a full or partial FAI

The first production run of a new part number needs a full FAI. After that, AS9102 section 4.6, as quoted in prime-contractor supplier guides, requires a full or partial FAI for the affected characteristics when any of the following occurs:

  1. A design change affecting fit, form, or function, such as a new drawing revision or a changed BOM.
  2. A change in manufacturing source, process, inspection method, location of manufacture, tooling, or materials that can affect fit, form, or function. Moving the build to a new contract manufacturer or a new facility is the obvious case.
  3. A change in numerical control program or translation to another medium. For a PCBA, regenerating placement or test programs for different equipment is worth evaluating.
  4. A natural or man-made event that may adversely affect the manufacturing process.
  5. Corrective action needed to complete a previous FAI.
  6. A lapse in production of two years, counted from the last production operation to the restart.

A partial FAI, often called a delta FAI, addresses only the changes from a baseline part number. It is valid only if every other characteristic conformed on the previous FAI and is still produced by the original processes. Form 1 must record the baseline part number with its revision and the reason for the partial FAI.

Walkthrough: building the FAIR for a circuit card assembly

Treat the report as a planned activity, not paperwork after the build. These steps follow the order most teams use.

Step 1: Freeze the configuration

Lock the assembly drawing revision, parts list revision, approved deviations, and the purchase order's quality clauses before kitting. Every later entry ties back to these, and a revision that moves mid-build forces rework of the report.

Step 2: Balloon the drawing, notes included

Number every characteristic on the assembly drawing and carry it to Form 3. Notes count: "assemble per IPC-A-610 Class 3," "conformal coat per the coating specification," "mark serial number per the marking note." A note that does not apply is marked not applicable, never skipped.

Step 3: Account for every BOM part on Form 1

Under Rev C, each part on the BOM is listed on Form 1 with its part type: detail part, sub-assembly, software, standard catalogue item, or COTS. Commercial off-the-shelf components are listed but generally do not need FAIRs of their own, though some customers ask for their certificate of conformance numbers. The bare board is different: it is built to your fabrication drawing, so it is not COTS and is typically listed as a detail part with its own FAIR from the fabricator.

Step 4: Build Form 2 from materials and processes

List the materials and special processes the design calls for, each with specification, source, and a traceable certificate number: solder alloy and flux, conformal coating, plating, and any staking or underfill adhesive. Consumables that never appear on the BOM still belong here. Record the functional test procedure number and the certification that its requirements were met.

Step 5: Inspect the first article and record real results

Verify each Form 3 characteristic with a method suited to it: 3D AOI for placement, polarity, and visible joints; X-ray for BGA and QFN joints that cannot be seen; IPC-A-610 inspection at the class the drawing specifies; and checks of coating coverage, keep-out areas, labels, and serialization. Characteristics that are pass or fail by nature can be recorded as conforming with the method used. Measured characteristics need the actual value, not "OK."

Step 6: Review, approve, and close nonconformances

Rev C separates the person who reviews the FAIR from the person who approves it, and the two should be different people. Form 1 also records whether the report contains a documented nonconformance. A nonconforming characteristic goes through the nonconformance process, and once the cause is corrected, the affected characteristics are verified again; corrective action needed to complete a previous FAI is itself one of the section 4.6 triggers.

AS9102 FAI questions procurement engineers ask

These questions come up on nearly every aerospace PCBA program.

Does every component on a PCBA need its own first article report?

No. Unmodified commercial off-the-shelf components, such as standard resistors, capacitors, and ICs bought to a manufacturer part number, generally do not need FAIRs of their own. Rev C does require every BOM part to be listed on Form 1 with its part type, and some customers want each listed with a certificate of conformance or traceability number. Custom parts built to your drawings, including the bare board, machined brackets, and custom cable assemblies, are detail parts or sub-assemblies and need their own FAI evidence. A modified COTS part is treated like a custom part for the changed features.

What is the difference between a full FAI and a partial FAI?

A full FAI verifies every characteristic on the drawing and every item on all three forms. A partial, or delta, FAI covers only the characteristics affected by a change from a baseline part number that already passed a full FAI, provided everything else is still produced by the original processes. Form 1 must name the baseline part number, its revision, and the reason. A drawing revision that adds one component, or a move to a new SMT line, often justifies a partial FAI rather than a full one.

How long does an approved FAI stay valid?

There is no fixed expiration date. Once invoked, the FAI requirement continues to apply, and the approved report stands until one of the section 4.6 triggers occurs. The time-based trigger is a two-year lapse in production, counted from the last production operation to the restart, which requires updating any characteristics the inactivity may affect. Some customers set their own rules in their quality clauses, so check the purchase order.

Does a change to an approved alternate part trigger a new FAI?

It depends on whether the change can affect fit, form, or function, and on what the customer's clauses say. Swapping between manufacturers already approved on the parts list, at the same specification, is usually handled through the BOM and traceability records. Introducing a part that is not on the approved list, or one with a different package or rating, changes materials or design, so evaluate it for a partial FAI and get the customer's agreement first.

Can a functional test replace inspecting the characteristics?

No. A passing functional test shows the board works today; it does not show the build matches the drawing. A reversed polarized capacitor, a marginal BGA joint, or a missing conformal coat can pass functional test and fail in the field. AS9102 accounts for the test on Form 2 and for each characteristic on Form 3, so both are needed. On an aerospace PCBA, workmanship is typically verified against IPC-A-610 Class 3 in addition to the electrical tests.

Who signs the FAIR under AS9102 Rev C?

Under Rev C, sign-off sits on Form 1, with separate fields for the person who reviewed the FAIR and the person who approved it, and those should be different people. The signature blocks on Forms 2 and 3 were removed. Customers can add their own requirements, such as source inspection, approval through a supplier portal, or a government representative's review, so confirm who on the customer side must accept the FAIR before the first shipment.

Should the FAI be done on a prototype build?

No, unless the customer asks for it. FAI verifies the production process, so the representative item should come from the first production run, built with production documentation, tooling, and programs. A prototype often uses hand placement, temporary fixtures, or a different line, which would make the result unrepresentative. A first-article review of a pilot build can still catch problems early, but the formal FAIR belongs to production.

Common mistakes that delay FAIR approval

Supplier quality teams at aerospace primes publish guidance on recurring FAIR problems, and the same patterns show up on PCBAs.

  • Drawing notes left off Form 3. Every note needs a result or a not-applicable entry. Grouping notes that do not apply is acceptable; silently skipping them is not.
  • No reason for the full or partial FAI. Rev C makes the reason mandatory on every FAI, and a partial FAI also needs its baseline part number and revision.
  • Incomplete lower-level part data. Missing part types, FAIR references for custom parts, or certificate numbers for BOM items.
  • Consumables missing from Form 2. Coatings, adhesives, and other process materials that are not on the BOM still need their specification and certificate.
  • Certificates that do not trace. A material or special process listed without a traceable certificate number, or from a source not approved for that process.
  • "Pass" where a value is required. Recording a measured characteristic as pass instead of the actual result.

How i-TECH e-Services handles first article inspection

i-TECH e-Services is an AS9100D certified and ITAR registered contract electronics manufacturer in Norcross, Georgia, building PCB assemblies, cable assemblies, and box builds for aerospace and defense programs. When a purchase order flows AS9102 down, the first article is planned with the build:

  • Inspection data from production equipment. Placement, polarity, and solder joints are verified with 3D AOI (Parmi) and hidden BGA and QFN joints with X-ray (Glenbrook), with electrical verification by SPEA flying-probe test and functional test. See quality and testing.
  • Workmanship to the class on the drawing. Assemblies are soldered to J-STD-001 and inspected to IPC-A-610, including Class 3 for aerospace hardware. Certifications are listed on the certifications page.
  • Traceability that fills Forms 1 and 2. Component lot and date codes, inspection results, and material certifications are recorded for every assembly, the same records the FAIR draws on.

For more on how AS9100D shapes a supplier's quality system, see AS9100D vs ISO 9001 for contract manufacturers, and for the inspection side, BGA and QFN inspection with AOI and X-ray. To plan the first article for your next aerospace build, contact the i-TECH engineering team with your drawing package and quality clauses.

Bottom line

AS9102 first article inspection on a PCBA is accountability on three forms: every part, every material and special process, and every characteristic, notes included. Know which section 4.6 triggers apply to your change, list every BOM part as Rev C requires, record actual results, and keep review and approval separate. Plan the FAIR alongside the first production build, not after it, and the first article becomes a release point instead of a delay.