Skip to main content
Rapid Prototyping

Rapid PCB Prototyping to Production

Accelerate your product development with fast-turnaround prototypes, expert DFM support, and seamless transition to production volumes.

Speed to Market

Quick-turn prototypes in 5-7 days to accelerate your development cycle

Design Collaboration

Engineering support throughout the development process

Production-Ready Design

DFM/DFA optimization ensures smooth transition to volume production

Seamless Scaling

Smooth transition from prototype to production volumes

Prototyping Services

Comprehensive prototyping support from initial concept to production transition

Quick-Turn PCB Prototypes

Fast-turnaround prototype assembly to validate your designs quickly

  • 5-7 day standard turnaround
  • Express 3-day service available
  • Complex designs supported
  • Full assembly documentation

Design for Manufacturing (DFM)

Expert analysis and optimization to ensure your design is production-ready

  • Component placement review
  • Thermal management analysis
  • Testability assessment
  • Cost optimization recommendations

Functional Testing

Validate your design before committing to production runs

  • Custom test fixtures
  • Electrical validation
  • Performance verification
  • Environmental testing

Small Batch Runs

Bridge manufacturing between prototype and full production

  • 10-500 unit quantities
  • Production processes
  • Quality control standards
  • Inventory management

Prototyping Capabilities

500+
Prototypes Per Year
5-7 Days
Standard Turnaround
95%
First-Pass Success Rate

Design Support

  • Complex multi-layer designs (up to 20+ layers)
  • Fine pitch components (0201, BGAs, QFNs)
  • Mixed technology (SMT + through-hole)
  • High-density interconnect (HDI) designs
  • Component sourcing assistance

Engineering Collaboration

  • Design for manufacturing (DFM) review
  • Design for assembly (DFA) optimization
  • Design iteration support and feedback
  • Test strategy development
  • Cost reduction recommendations

Prototype to Production Journey

A proven process that takes you from initial concept to volume manufacturing

Prototype Phase

Fast iteration with engineering feedback, typically 2-4 cycles to achieve a production-ready design. We work closely with your team to refine and optimize every aspect.

  • Initial build and functional testing
  • DFM feedback and design refinement
  • Testing and validation iterations
  • Production process development

Production Transition

Seamless handoff with established processes, tooling, and quality standards already in place. Your prototype becomes production-ready without starting from scratch.

  • Proven assembly processes in place
  • Test fixtures and procedures ready
  • Supply chain and materials established
  • Quality systems and documentation complete

How Our Contract Manufacturing Process Works

From prototype to full-scale high-mix production, we deliver on your precise requirements.

1

NDA + Files

Your journey begins when you submit your Gerbers, BOM, or XML. Your NDA is signed immediately to protect your intellectual property, making sure your ideas are safe with us from the very first moment.

2

Detailed Quoting

Next, you receive transparent quoting with zero surprises. We committo a confirmed delivery date for you. That timeline begins once all your project's parts have arrived at our facility.

3

Production Run

Finally, we finish the production run, which is followed by meticulous Testing, Validation, and Packaging for your shipment. During production, we give constant updates, usually on a weekly basis, and you have direct access to the engineers working on your project.

AS9100D & ISO 13485:2016 Certified, ITAR Registered

Looking for a specific certification or want to see our complete list? Reach out to our team — we're here to help you find exactly what you need.

AS9100D Certified

AS9100D Certified

Aerospace Quality Management Standard

ISO 13485:2016 Certified

ISO 13485:2016 Certified

Medical Device Quality Management

WBENC Certified

WBENC Certified

Women's Business Enterprise Council

ITAR Registered

ITAR Registered

Defense & Security Cleared Facility

UL Compliant

UL Compliant

Underwriter's Laboratories Standards

Prototyping FAQ

Common questions about turn time, DFM, low-volume runs, and moving from prototype to production.

Standard prototype PCB assembly ships in 5-7 business days once files and parts are in hand, with a 3-day express option for urgent builds. We confirm the exact turn time when we return your DFM review and quote.

Request a Quote — PCB Assembly, Cable Assembly & Box Build

Get a detailed quote from our experienced engineering team to discuss your manufacturing requirements and project specifications.

Contact Us

Fill out the form below and our team will contact you.

Privacy Policy and Terms of Service.